When the Price Changes: Understanding Change Orders Before You Sign
Part 1 · Before the Finished Photos

Few sentences can change the mood of a project conversation faster than “We need to discuss an additional cost.”
You may have spent months deciding what you could afford. You may already have made compromises to arrive at a comfortable scope. Hearing that the price could change can bring up a very reasonable question: why was this not included in the first place?
That question deserves an answer.
A change order is a written modification to the project agreement. It can address scope, price, schedule, or other details; it is not automatically a bill for more money. The National Association of the Remodeling Industry’s glossary offers a useful plain-language definition.
Begin with what changed and why
Different situations can lead to a proposed change. A homeowner may choose a different product or request additional work. An opened wall may reveal a condition that could not be confirmed earlier. A design revision may affect work that has already been planned or completed.
These explanations are not interchangeable. A requested upgrade should be described as an upgrade. A concealed condition should be explained with the evidence available. A disagreement about what the original scope included requires looking at that scope together.
If the issue involves a mistake or an omission, it should be discussed honestly on that basis. Calling something a change order does not, by itself, establish that the homeowner is responsible for the cost. The facts and the project agreement matter.
Ask what the proposed price actually includes
A useful change-order conversation connects the price to a specific change in the work.
Consider a homeowner who asks to move a garage window after the opening has been framed. The change may involve more than the window itself: adjusting framing, changing exterior details, or revisiting work already completed. The explanation should make that connection understandable.
It should also identify work being removed or replaced. If one choice takes the place of another, ask how any applicable credit is being handled. You should understand the net effect on the project, rather than assuming every change is simply added to the original total.
Ask whether the proposed amount resolves the issue or whether part of the scope remains uncertain. If more investigation is needed, that uncertainty belongs in the conversation before it becomes another surprise.
How Reformation documents and approves changes
Reformation provides a written change order to the customer. We explain the reason through photographs, video, or an in-person explanation. The written change order also details our reasoning and is sent to the customer for review and sign-off.
Except in an emergency, we do not proceed with the change-order work until the customer has provided written approval by signature.
This gives you a point in the process to read, ask questions, and make a decision. A discussion at the house or a phone call may help everyone understand the issue, but it does not replace the required signature.
Emergency situations are the exception to that normal sequence. It is worth discussing before construction how an urgent situation would be handled under your project agreement, including contact arrangements when immediate attention is needed.
Before approving a change, you should understand the work, the reason, the price, and the effect on the plan.
The calendar may change along with the scope
An added feature may require a different product, another trade visit, revised drawings, or a change in the sequence. Even a relatively small physical alteration can affect work that depends on it.
Ask about timing alongside cost. Does the change affect a particular milestone or the expected completion date? Is the impact known, or does someone still need to confirm availability? Is there a decision deadline, and what happens if you need more time?
At Reformation, we communicate delays as promptly as possible and communicate anticipated delays as soon as we foresee them. You should not have to infer a schedule change from the fact that something has not happened yet.
Five questions before you sign
- What specifically changed from the agreed scope, and what caused it?
- What evidence or explanation helps us understand the proposed work?
- What is the net price, including any applicable credit for work being removed?
- What effect could the decision have on sequencing and completion?
- Are there reasonable alternatives, and what would each option change?
Some conditions require a solution before the affected work can continue. Other changes are optional. Understanding which kind of decision you are making helps you evaluate the choices without treating every request as equally urgent.
The Ohio Attorney General’s home improvement guidance is a local resource for the value of clear written terms and approval of changes.
A clear decision is better than an uncomfortable assumption
You are allowed to ask for an explanation you understand. You are allowed to say that a proposed upgrade does not fit your priorities. When a necessary condition needs attention, you are allowed to ask how the proposed solution was developed.
The contractor’s role is to make the issue understandable and explain the available path forward. The homeowner’s role is to review the information and make the required decision. Both benefit when that decision is recorded clearly.
For Reformation, the signed change order is an important part of that clarity. It keeps the conversation connected to the work the customer actually approved.